Pneumatic Beading Machine
Review the MS-15 profile task alongside its supplied pressure and power entries; confirm the exact utility definitions.
- Model
- MS-15
- Pressure entry
- 0.5–0.8 MPa
- Power
- 0.75 kW

Define pressure, drive and workpiece independently
Supplied working/fluid-pressure entry; confirm medium and supply definition.
Listed power; voltage/frequency require configuration confirmation.
Reference sheet thickness; grade and tooling must match.
MS-15 belongs to a specific profile task
Tooling and setup scope
Specify the bead/groove section, workpiece access and material range. Pressure availability alone does not establish that the profile tooling suits the part.
Ask for supply medium, connections and required utilities together with the selected configuration.
MS-15 Reference Parameters
| Model | MS-15 |
|---|---|
| Sheet Thickness | 1.5 mm |
| Working / Fluid Pressure | 0.5–0.8 MPa |
| Power | 0.75 kW |
| Weight | 130 kg |
| Dimensions | 850 × 600 × 1200 mm |
The original label is Working / Fluid Pressure. Confirm what medium and operating requirement it describes instead of inferring an unlisted air consumption or hydraulic system.
Trial the formed workpiece
- 01
Specify profile
Approve section and location.
- 02
Confirm utilities
Use the quoted medium and electrical standard.
- 03
Form sample
Use the intended grade/thickness.
- 04
Inspect fit
Check geometry, finish and subsequent operations.
Questions to settle before ordering
What pressure medium is required?
Confirm the supplied working/fluid-pressure definition and connections for the configuration.
Is consumption specified here?
No. Request the utility data rather than inventing it from pressure.
Which bead is supplied?
Confirm the section drawing and actual roller/tooling arrangement.
Is 1.5 mm a universal rating?
No. Confirm the actual grade and forming profile.
What should a sample show?
The required profile on the real workpiece with agreed finish and fit.
Tell Us Your Pneumatic Beading Requirements
Send your sheet material, thickness, required forming profile, air supply and electrical standard so we can confirm the MS-15 configuration.
